You walk up to the house, and the bottom course of siding is hanging loose off the wall, or it pops out when you push on it. The homeowner thinks the whole side needs new siding. Usually it doesn't. You unzip the courses above, take out the bad starter strip, hang a new one level without nailing it tight, and zip everything back together. In most cases you don't tear off the wall. The two things to work out are how much siding has to come off and what to charge for the time.
Is it a starter strip problem, and can you fix it without tearing off the wall?
A starter strip has one job: it holds the first full course of siding. The bottom edge of the lowest panel locks into it, and the strip is nailed along the bottom of the wall. When the strip cracks, rots out, or was never put on, that first course has nothing to hold it.
Signs you're looking at a starter strip problem:
- The bottom course is loose or sagging
- Panels pop out at the bottom edge, often after wind
- The house never had a strip at all
Don't skip that last one. One caller to a home-repair radio show had siding with no starter strip, nailed across the top only, and over the years moisture got in and the siding deteriorated.
Don't mix it up with J-channel, either. J-channel is a different part. It gives cut panel edges a pocket around windows, doors and things that go through the wall. If the trouble is at a window, it's probably not the starter strip.
How much you open up depends on how far the damage runs. If one section of strip is cracked, you open that stretch of the bottom course and maybe the course above it. If the damage runs the whole length of the wall, it's a bigger job, and I come back to that at the end.
Tools and materials
This is a short list, which is part of why repair work is a low-cost way to get started.
- Zip tool (the small curved tool with a hook that unlocks and relocks interlocking siding)
- Flat pry bar for pulling nails
- Utility knife and tin snips
- Level and chalk line
- Hammer
- Corrosion-resistant nails. This Old House calls for 1¼- to 1½-inch aluminum siding nails for panels. For the strip itself, go by the strip maker's sheet.
- New starter strip
- A few spare panel pieces, in case you crack one on the way out
- Safety glasses
The Vinyl Siding Institute also lists a snap lock punch and a nail hole slot punch. They're cheap and worth having on the truck.
Weather matters. This Old House recommends doing vinyl repairs in summer, when the plastic is warmer and bends more easily. It's fall now, and the mornings are cold. Schedule these jobs for the warm part of the day, and go slower when the vinyl is cold and stiff.
Step by step: unlock, remove, install, relock
To be clear, this is the standard zip-tool panel repair put together with the install specs for a new strip. Treat the siding maker's instructions as the final word, because they may differ.
1. Unlock the courses. Hook the zip tool into the joint above the bottom course and pull it along to unlock it. Do the same for each course you need to get out of the way. To take out a panel, unzip the joints above and below it, then pry out its nails.
2. Pull the old strip. Take out the old strip and every nail. Don't leave old nails behind to fight the new strip.
3. Check the sheathing. With the strip off, look at the wall behind it and probe it. If water has been getting in down there, this is where you'll find soft wood. Fix rot now, before anything goes back over it. Make sure the water-resistive barrier and flashing are right too, because siding alone doesn't keep water out.
4. Set the new strip level. Snap a chalk line. Fine Homebuilding says to snap it from the center out to both corners on long walls, so the line doesn't sag in the middle. If you're only replacing one section, match the old line. The new piece has to line up with the strip on either side, or the courses above it won't sit right.
5. Hang it, don't nail it tight. Nail in the center of the slots. Spacing advice varies: Fine Homebuilding says every 12 to 14 inches, and VSI says accessories go 8 to 12 inches on center at most. Follow the manufacturer's sheet. If you don't have one, 12 inches works under both. Put the first nail at least 4 inches from the end of each piece. Leave about 1/32 inch, roughly the thickness of a dime, between the nail head and the vinyl. Fine Homebuilding puts it in four words: "Don't nail it—hang it." The strip has to slide under the nail heads.
6. Leave gaps. Leave 1/4 to 1/2 inch between sections of strip. Stop at least 1 inch short of outside corner trim and 1½ to 2 inches short of inside corners. Vinyl grows and shrinks with the temperature, and these gaps give it room.
7. Hook the bottom course back in. Lock the bottom edge of the lowest panel into the new strip. If you replaced any panels, overlap each one at least 1 inch onto the panels at each end.
8. Zip everything closed. Hook the zip tool on the top lock of the course, pull it out and down, press the lower edge of the siding above in until it catches, then slide the tool along. Work your way up until every course you opened is locked.
Mistakes that bring you a callback
A callback eats into a small job's profit. These are the ones to watch for:
- Nailing the strip tight. Siding has to move on its nails. A tight nail makes it ripple, and the bottom course follows whatever the strip does.
- No gaps between sections. If strip pieces are butted tight, they have nowhere to go when they expand on a hot day. Leave the 1/4 to 1/2 inch.
- Strip out of level. Every course above sits on the strip. If you set the strip crooked, the courses above it come out crooked too, and everybody can see it from the street.
- Cracking the strip with the zip tool. Seat the hook fully in the lock before you pull. A half-seated hook can slip and catch the edge instead of releasing it, and that's riskier on cold fall mornings.
- Skipping the rot check. If you hang a new strip over soft sheathing, the failure is still there. You've just covered it, and it's now your name on the job.
- Mixing up starter strip and J-channel. They're different parts with different jobs. J-channel at the bottom of a wall won't hold the first course the way a starter strip does.
Pricing and time, and when to say no
I don't have a set price to give you for this job. It depends on how many courses come off, what's behind them, and what parts cost where you are. Don't price it off what homeowner cost guides say people pay. Those aren't a repairman's numbers.
My repair jobs ran mostly 1 to 3 hours. On my mix of work, my average ticket was about $350 a repair. That's my number, not a promise for your zip code. A short starter strip swap sits in that small, quick range. It's a good job to bundle: while the bottom course is open, look at the rest of the wall and quote anything else that's loose or cracked. Fall is a good time to offer that, because people want the house sealed up before winter and looking right before family comes for Thanksgiving.
When to say no, or quote a different job entirely:
- Long damaged runs. If the strip is bad along the whole wall, you're doing a partial re-side. Price it that way, or pass.
- Brittle old vinyl. If panels crack as you unzip them, every course you open turns into another panel to replace.
- Discontinued profiles. If you can't find panels that match, any piece you break is a patch that won't match. Tell the homeowner before you start, not after.
Licensing and insurance depend on where you work. Check yours before you take jobs like this.